Construction estimating glossary, in plain English.
The words estimators use every day, explained without jargon: what each term means on a real bid, and where it shows up in ScopeDive. Link to any term with its own address.

Terms
- Addendum
A change to the bid documents issued before bids are due: new or revised drawings, spec changes, answers to questions, or a new due date. Addenda are numbered, and every bidder is expected to include them. Most bid revisions start with an addendum.
- Alternate add
A priced option the owner may choose to add to the base bid, such as an upgraded finish or an extra canopy. It is listed separately, with its own number, so the base bid stays clean. In ScopeDive, alternates are numbered and priced as their own scopes, never inside the base bid.
- Alternate deduct
A priced option that reduces the base bid if the owner accepts it, such as a cheaper material or a scope removed. Like an alternate add, it is numbered and listed separately from the base bid.
- Bid invite
An invitation from a general contractor (or owner) to bid a project, usually with the bid documents, the due date and the bid form. The same project often arrives from several GCs. In ScopeDive, every bid invite goes into the Bid Inbox with a decision and an estimator.
- Bid leveling
What a general contractor does when comparing subcontractor bids for the same scope: lining them up so they cover the same work, adjusting for items one bidder included and another excluded, then comparing prices. Clear scope descriptions, qualifications and exclusions make your bid easier to level fairly.
- Cost bucket
A heading you want a total for on every scope, such as Material, Shop Fabrication, Finish or Field Erection. In ScopeDive each company defines its own cost buckets in the Engine Room; Material is always one. Every bucket shows on the scope page with its total.
- Cost component
One way a cost gets into a scope: how the number is entered (typed or from the library), how it is calculated (for example hours × rate or quantity × rate), its default rate, and the cost bucket it lands in. In ScopeDive a company can have up to 100 active cost components.
- Current set
The latest version of the bid documents: the original drawings and specs with every addendum applied. Pricing from anything other than the current set is one of the most common causes of a wrong bid. ScopeDive AI reads the bid documents and the current set with addenda.
- Direct cost
The cost of doing the work itself (material, labor, equipment, subcontractors, freight), before markup and profit. In ScopeDive, a scope's cost buckets add up to its direct cost, and the project's direct cost is the sum of all active scopes.
- Markup
The amount added on top of direct cost to cover overhead and profit, usually as a percentage. In ScopeDive, markup follows the project or is set per scope; adders such as bonds and insurance, and sales tax, come after it.
- Proposal
The document a subcontractor sends with its price: the scopes included, alternates, qualifications, exclusions and the documents the price is based on. In ScopeDive the proposal is built from the estimate and exported as a PDF.
- Revision
A new version of a bid, usually after an addendum or a request from the GC. In ScopeDive a revision covers the whole bid and the old one is kept, so any two revisions can be compared by totals and cost buckets.
- RFI
Request for information: a written question to the GC or design team when the documents are unclear, incomplete or contradict each other. During bidding, a good RFI protects your number. ScopeDive AI drafts RFI questions for the estimator to review.
- Scope
A defined piece of the work that is priced on its own, such as "Stair 1, pan stair, three flights" or "Exterior guardrail, galvanized". A project is a list of scopes. In ScopeDive each scope has its own pricing basis, takeoff, cost buckets, notes, qualifications and exclusions.
- Takeoff
Measuring and counting the work from the drawings and schedules: quantities, sizes, lengths and weights. The takeoff is what the price is built on. In ScopeDive, takeoff lines are priced from your material library or typed, and can be pasted from Excel.