Structural steel
Structural steel estimating software built on your own shop and field rates.
Structural steel is priced by the member: shapes and plate from the mill, connections and fabrication in the shop, detailing, erection, cranes and freight. ScopeDive keeps each of those as a cost bucket you define, prices them from your library and your rates, and keeps every revision of the bid.

The problem with spreadsheets
Where structural steel spreadsheets break.
A steel estimate starts with a member takeoff: every beam, column and brace with its size and length, turned into weight. In a spreadsheet, that takeoff is typed in from the drawings or the member schedule, weights are looked up, and shop and field hours are estimated from the tonnage and the connection count.
The arithmetic is not the hard part. The hard part is keeping it current: mill prices that moved since the last bid, a member schedule revised in an addendum, an erection plan that changed when the crane did, and a GC asking for a number with and without the mezzanine.
Retyped takeoff
Member schedules are retyped by hand, and every retype is a chance to drop a line or a digit.
Prices that move
Material prices change between bid and buy. Finding which open bids a change touches is guesswork in a folder of files.
Options and revisions
With and without the mezzanine, before and after Addendum 3: copies of the workbook multiply and nobody is sure which is current.
Your setup
How a structural steel shop sets up its cost structure.
In ScopeDive each company builds its own list of cost buckets in the Engine Room, and Material is always one of them. A steel fabricator usually separates shop work from field work and keeps detailing, engineering, cranes and freight visible, because each has its own rate and its own risk.
Cost components carry the math: the hours your estimator types multiplied by your shop rate, crane days multiplied by your equipment rate, material weight from the library multiplied by your cost. ScopeDive does not calculate your fabrication or your rigging. Your components and your rates do, the same way on every bid.
How cost buckets and cost components work| Cost bucket | Example components | How the number comes in |
|---|---|---|
| Material | Wide flange, tube, angle, plate, bolts | From the library |
| Shop Fabrication | Shop hours, connections | Hours typed × your shop rate |
| Shop Drawings | Detailing hours | Hours typed × your rate |
| Engineering | Connection design hours | Hours typed × your rate |
| Finish | Shop primer, galvanizing | Weight × your finish rate |
| Field Erection | Ironworker hours | Hours typed × your field rate |
| Cranes & Rigging | Crane and equipment days | Days typed × your rate |
| Freight to Site | Trips | Quantity × your rate |
An example only. Every shop names and maps its own buckets and components in the Engine Room; the rates are always yours.
Scopes and AI
Break the job into scopes you can price and defend.
A building rarely prices as one lump. Splitting the job into scopes, by area, level or system, gives every part its own takeoff, its own totals by cost bucket and its own notes and exclusions.
- Frame, levels 1 to 3
- Roof framing and dunnage
- Moment frames
- Lintels and loose steel
- Mezzanine (Alternate 1, add)
- Canopy steel (Alternate 2, deduct)
ScopeDive AI can turn printed steel member schedules into takeoff lines for the estimator to review, draft scopes from the specs with the source words quoted, flag document conflicts and draft RFI questions. Everything lands in an AI draft revision; the estimator accepts, edits or rejects each line. It does not read plan geometry and it never prices. See ScopeDive AI.
Alternates are priced as their own scopes and listed beside the base bid, never inside it. When an addendum arrives, revise the whole bid, keep the old one and compare the two by cost bucket.

Getting started
Moving a structural steel shop off spreadsheets, in three steps.
You do not have to rebuild your estimating method. You move it into a structure the whole team can see and check.
- Bring your library.Import your materials (shapes, plate and bolts) from Excel or CSV, with your own costs, weights and suppliers.
- Set your buckets, components and rates.Name the cost buckets you review on every bid and the cost components behind them, up to 100 active components per company, with your own default rates.
- Price a bid you already know.Take a structural steel project you bid last month and price it again in ScopeDive. Compare the two numbers line by line; the differences show where the spreadsheet was hiding something, or where your setup needs a tweak.
We help you bring in your library, your rates and your past bids. Get started or compare ScopeDive with Excel.
See it on your work
Price your next bid in ScopeDive.