Stairs & railings
Stair and railing estimating software, priced flight by flight.
Every stair is a small building: stringers, pans, landings, nosings, rails, posts and base plates, shop hours and field hours, finish and freight. ScopeDive prices each stair and each rail run as its own scope, line by line from your library, with the hours your estimator types multiplied by your rates.

The problem with spreadsheets
Why stair and railing bids are hard to keep straight.
Stair and railing work is detailed and repetitive at the same time. Stair 1 and Stair 3 look alike but differ by a landing. The guardrail is galvanized outside and painted inside. The handrail spec changed in an addendum. In a spreadsheet, each stair becomes a copied tab, and every copy carries yesterday's mistakes forward.
When a GC asks why one stair costs more than another, the answer should be on one screen: more risers, a heavier stringer, more field hours. In a stack of copied tabs, it is an afternoon of digging.
Copied tabs
Each stair starts as a copy of the last one. A fix made in one copy never reaches the others.
Mixed finishes
Galvanized, primed, powder coated, stainless: finish costs change line by line and are easy to apply to the wrong item.
Field conditions
Field measure, field welding and installation hours vary by site. Rates buried in formulas are hard to check.
Your setup
How a stair and railing shop sets up ScopeDive.
Your cost buckets are the totals you want to see on every stair. Material is always one. Stair shops often keep field measure separate from field erection, because a site visit is a real cost that is easy to forget.
Cost components multiply what the estimator enters by your rates: shop hours by your shop rate, field hours by your field rate, material weight from the library by your finish rate. Setup profiles define what a scope carries, its attributes, components and takeoff columns, so every stair is priced on the same grid.
How cost buckets and cost components work| Cost bucket | Example components | How the number comes in |
|---|---|---|
| Material | Channel, plate, pans, pipe, posts, anchors | From the library |
| Shop Fabrication | Shop hours | Hours typed × your shop rate |
| Finish | Galvanizing, primer, powder coat | Weight × your finish rate |
| Shop Drawings | Detailing hours | Hours typed × your rate |
| Field Measure | Site visit hours | Hours typed × your rate |
| Field Erection | Installation hours | Hours typed × your field rate |
| Freight to Site | Trips | Quantity × your rate |
An example only. Every shop names and maps its own buckets and components in the Engine Room; the rates are always yours.
Scopes and AI
One scope per stair, one scope per rail run.
Each stair and each railing run becomes its own scope with its own pricing basis, drawing references, takeoff grid and notes. The scope page shows every cost bucket with its total and its cost per unit, so stairs can be compared at a glance.
- Stair 1, pan stair, three flights
- Stair 2, pan stair, two flights
- Exterior guardrail, galvanized
- Interior handrail, painted
- Lobby feature rail (Alternate 1, add)
Qualifications and exclusions sit on each scope ("concrete fill placed by others", "field touch-up excluded"), and the ones you choose show on the proposal under the stair they belong to.
ScopeDive AI can draft stair and railing scopes from the specs with the source words quoted, flag conflicts between documents and draft RFI questions. The estimator accepts, edits or rejects each draft line. It does not take off from the drawings and it never prices. See ScopeDive AI.

Getting started
Moving a stair and railing shop off spreadsheets, in three steps.
You do not have to rebuild your estimating method. You move it into a structure the whole team can see and check.
- Bring your library.Import your materials (channel, plate, pans, pipe, posts and anchors) from Excel or CSV, with your own costs, weights and suppliers.
- Set your buckets, components and rates.Name the cost buckets you review on every bid and the cost components behind them, up to 100 active components per company, with your own default rates.
- Price a bid you already know.Take a stair and railing package you bid last month and price it again in ScopeDive. Compare the two numbers line by line; the differences show where the spreadsheet was hiding something, or where your setup needs a tweak.
We help you bring in your library, your rates and your past bids. Get started or compare ScopeDive with Excel.
See it on your work
Price your next bid in ScopeDive.
Book a 20-minute tour and bring a bid you recently priced. We will show you how your library, your rates and your cost structure would look in ScopeDive.